03Concept study sheets · drawings, not built work

Sheet 01 of 04 · elevationEMB-S-001 · concept study

Study 01 · concept

Spiral stair

A 1.6 metre spiral around a single column: thirteen risers, oak treads on steel carriers, and a flat-bar handrail rolled to the helix in one length.

Material
Mild steel column and carriers, solid oak treads
Size
Ø 1600 mm, 2850 mm floor to floor
Finish
Shot blast, zinc primer, powder coat RAL 9005 matt
Fixing
Base plate to slab, landing bracket to trimmer
Lead time
Typically 6 to 8 weeks from approved drawing

Typical project starts from£7,800 – £11,500

Sheet 02 of 04 · elevationEMB-B-002 · concept study

Study 02 · concept

Raking balustrade

A 50 × 10 flat top rail over square bars, raking with the flight and turning level along the landing without a break in the line.

Material
Mild steel flat and 12 mm square bar
Size
1100 mm on the landing, 900 mm on the rake, seven goings
Finish
Powder coat, RAL colour to suit
Fixing
Posts side-fixed to the stringer and landing edge
Lead time
Typically 3 to 4 weeks from approved drawing

Typical project starts from£1,600 – £2,400

Sheet 03 of 04 · elevationEMB-G-003 · concept study

Study 03 · concept

Arched driveway gate

A pair of leaves under one arched top rail, 3.2 metres clear, framed in box section and prepared for underground automation.

Material
60 × 60 box frame, 16 mm square bars
Size
3200 mm clear opening, 1900 mm to the crown
Finish
Hot-dip galvanised, powder coat RAL 7016
Fixing
150 mm box posts set in concrete
Lead time
Typically 5 to 6 weeks from approved drawing

Typical project starts from£3,200 – £4,600

Sheet 04 of 04 · sectionEMB-C-004 · concept study

Study 04 · concept

Tie-rod entrance canopy

A 2.4 metre cantilever on tapered steel arms, hung on 20 mm tie rods and carrying laminated glass on stand-offs.

Material
Steel plate arms, stainless tie rods, laminated glass
Size
2400 mm projection, 3000 mm wide, 2600 mm clear
Finish
Galvanised and powder coated
Fixing
Resin anchors to the engineer’s detail
Lead time
Typically 6 to 8 weeks from approved drawing

Typical project starts from£4,400 – £6,800